Church Lane, Backwell Farleigh

Church Lane Homes

Nine homes on 0.44 hectares of land at Church Lane, Backwell Farleigh, North Somerset. This page explains what has been applied for and how to comment.

01

The proposal

An application for permission in principle has been made to North Somerset Council for nine homes on land at Church Lane, Backwell Farleigh. The site is 0.44 hectares.

This page sets out what has been applied for, shows the submitted site plan, lists the supporting documents and provides a way to send comments to the applicant's agent.

What permission in principle does and does not decide

Permission in principle is a two-stage consent route. At this first stage the council decides three things only: whether this is an acceptable location for housing, whether residential use is acceptable, and the amount of development.

Design, materials, landscaping, drainage details and the detail of the highways design are not decided at this stage. They are settled at the second stage, technical details consent, which is a separate application with its own public consultation and its own opportunity to comment.

The site plan shown on this page illustrates one way nine homes could sit on the site. It is not an approved layout, and the arrangement of plots, access and planting could change at the technical details stage.

Key facts

Local planning authority
North Somerset Council
Application type
Permission in principle
Application reference
Not yet issued
Number of homes
Nine 4/5 bed detached homes
Site area
0.44 hectares
Stage
One of two. Technical details follow separately
02

A low density housing scheme

Nine detached homes are proposed on a site of 0.44 hectares, each intended as a four or five bedroom family house. The development area is drawn as a red line on the site plan, and a substantial part of the site sits outside it.

The result is fewer, larger plots, in keeping with the pattern of detached houses on generous plots along this part of Church Lane, with significant parts of the site planted for ecology. A scheme designed to maximise the number of units on the same area could accommodate around 14 or 15 homes at the densities normally sought from other developments in the area.

03

The Green Belt and grey belt

The site is in the Green Belt. North Somerset Council's own evidence has assessed it as potentially meeting the definition of grey belt.

The council's Stage 2 Green Belt Assessment Update, published in May 2026 as part of the evidence base for the emerging North Somerset Local Plan 2041, divides the Green Belt around Backwell into seven parcels. This site forms part of Parcel 3, "Lane east of Church Lane", assessed at paragraph 3.10 on page 26 and in detail at pages 81 and 82.

The council assessed Parcel 3 as making a weak contribution to three of the five Green Belt purposes: checking the unrestricted sprawl of large built up areas, preventing neighbouring towns merging, and preserving the setting and special character of historic towns. It assessed a moderate contribution to safeguarding the countryside from encroachment. The overall assessment was weak. Against the question of whether the parcel potentially meets the definition of grey belt, the council recorded: yes.

04

The site plan

This is the submitted site plan. Tap or click the drawing to open it full screen, where it can be zoomed and panned.

The nine plots are numbered 01 to 09 on the drawing. Those numbers are drawing references, not addresses, and the positions shown are indicative at this stage. The drawing also shows additional planting for wildlife.

Proposed site plan for land at Church Lane, Backwell. Nine plots numbered 01 to 09 sit within a red-line development area in the western part of the site, arranged around a single new access road running south to Church Lane. Plots 01, 02 and 03 line the western edge behind a retained hedgerow; plots 05, 06 and 07 line the eastern edge; plots 04, 08 and 09 sit in the centre. Existing and proposed trees are shown as green circles along the boundaries. The larger eastern part of the site, outside the red line, is hatched and annotated as remaining land to be used for ecology planting. An attenuation basin is shown at the south-western corner.
Drawing 26.016-002. Avec Design, 02.02.26 1:500 at A3
05

Supporting documentation

A range of supporting documents has been prepared for this application:

  • Ecology report
  • Bat survey
  • Dormouse survey
  • Hedgerow survey
  • Lighting assessment
  • Drainage plan

These have informed the design of the scheme and are submitted with the application. All of them can be viewed in full on North Somerset Council's planning portal, which is the authoritative record.

06

Have your say

You can send comments to the applicant's agent using the form below. Comments made here are read by the applicant's agent and the project team.

What is most useful to tell us

Specifics are more useful than general support or general objection, because specifics can sometimes be acted on and generalities cannot.

If the access concerns you, it helps to know exactly where: which junction, which stretch of lane, at what time of day. If a view matters to you, it helps to know which view and from where. If the layout sits badly against your boundary, it helps to know what would make it sit better.

We cannot promise to act on any particular point. Some of what is raised will be outside the applicant's control, some will be for the council to weigh rather than the applicant to fix, and some will be points on which we simply disagree. Objections are as useful to receive as support: they identify what the council will be asked to consider, and it is better to know about them now than at appeal.

Send a comment

Fields marked required must be filled in. Your email address is optional and is only used if you have asked for a reply.

Only if you would like a reply.

4000 characters remaining

Requests about your personal data should be emailed to the address in the privacy notice rather than sent through this form.

07

Your details

What you send through this form is held by the applicant's agent to understand local views and to reply where a reply has been asked for. The lawful basis is legitimate interests.

A themed summary of what people have said may be provided to North Somerset Council. Names, addresses and email addresses are not published, and comments are not reproduced in a form that would identify who wrote them.

Comments you make directly to the council are governed by the council's own privacy policy and are normally published on the planning portal, usually including your name and address.

If you want a copy of what is held about you, or want it corrected or deleted, the privacy notice explains how to ask. Those requests are not made through the form below.

Read the full privacy notice, cookie statement and terms